Feasibility Study for Mieres Hydropower Plant (Spain)
IDAE - Instituto para la Diversificación y Ahorro de Energía
The scope of the work include:
- Study of the alternative locations for the optimal emplacement of the utilization.
- Circulating flows study via the water supply piping.
- Determination of the optimal flow to equip.
- Analysis of different possibilities of equipment.
- Determination of the power to be installed.
- Calculation of the generated energy.
- Environmental study of the affected area.
- Investment budget estimate.
- Elaboration of economic-financial study.
- Final report and conclusions.