Skip to main content

News

May 21, 2024, Madrid | Dams and reservoirs, Transport, Roads and Highways, Railways and Tramway, Bridges and viaducts, Tunnels

ISO 19650-1/2. INFORMATION MANAGEMENT SYSTEM USING BIM

OFITECO has recently obtained ISO 19650 certification, marking a strategic advancement in its capability to lead infrastructure projects with a technological focus.

June 13, 2018, Madrid- España | Railways and Tramway

The Spanish Infrastructure Railway Administrator (ADIF) assigns OFITECO the technical assistance contract for the construction works of the new Sanabria train station (Zamora), as part of the high speed line between Madrid and Galicia

The contract comprises of a complete technical assistance, which must be completed within 11 months.

June 11, 2016, Madrid, Spain | Transport, Roads and Highways, Railways and Tramway, Underground Works, Bridges and viaducts, Tunnels

OFITECO has been selected by CEDEX to maintain its road surface test track (Spain)

This experimental road Surface is unique in Spain due to the diversity and complexity of the equipment installed. The contract includes the preventive and corrective maintenance of weight simulator vehicles, control and instrumentation systems and testing infrastructure and equipment.

April 06, 2016, Riyadh, Saudi Arabia | Transport, Railways and Tramway, Underground Works, Tunnels

OFITECO progresses in the monitoring of the Metro de Riyadh’s Line 5 (Saudi Arabia)

OFITECO’s wide knowledge about instrumentation of underground works, together with the advantage of working with a local partner, allow the consortium to fulfil the requirements of the contract signed with the FAST consortium.

October 16, 2015, Basauri, Vizcaya, Spain | Transport, Roads and Highways, Railways and Tramway, Underground Works, Bridges and viaducts, Tunnels

OFITECO has been selected by ADIF to draft the project for the entrance stretch to Bilbao, which belongs to the new railway network (Spain)

ADIF has again put its trust in OFITECO to draft a project of the Basauri – Cantalojas tunnel 5km stretch. It is especially important since it involves the underground entrance to the city centre (Abando station) from Vitoria, San Sebastián and Irún.

December 22, 2014, Madrid, España | Transport, Roads and Highways, Railways and Tramway, Underground Works, Tunnels

OFITECO is granted CDTI financial aid for the development of TUNNELDATA project

The Centre for the Development of Industrial Technology (CDTI), through its Operative Plan FEDER Madrid, has granted OFITECO the requested assistance for the development of the TUNNELDATA project.