August 05, 2022, Viator (Almería), Spain |
The contract is worth 900,095.93 € (VAT excluded) and will be executed for a period of 39 months.
Currently, the connection between the A-7 and A-92 motorways is made by means of a diamond-type junction with a lower roundabout with an outer diameter of 116 m, which also receives traffic from the A-1000 road (North Access to Almeria) and the access road to the Legion Military Base.
Due to the high volume of traffic on this section of the A-7 and A-92 motorways, as well as the A-1000 road, situations of high congestion occur at peak hours, causing long delays, with the consequent detriment to drivers.
With the aim of solving the current problem, the project solution contemplates the construction of a new three-level junction, defining four new direct branches which will resolve the movements between the A-7 and A-92 motorways. It is also planned to double the carriageway on the A-1000 road, and to restore the access to the Legion Military Base and the service roads that will be affected by the works.
A total of eleven structures are planned: four overpasses on the branches of the new junction; an overpass over the A-7; another overpass at the access to the Legion Military Base; a subway for a road crossing Branch 2; and four vaults for transversal drainage. Four reinforced concrete gravity walls and a reinforced soil wall have also been defined.
The works to be carried out by OFITECO consist of:
This new contract gives continuity to other similar works carried out by OFITECO for the General Directorate of Roads and consolidates OFITECO as a reference company in the sector.