Skip to main content

News

August 04, 2022, Marseille, France | Dams and reservoirs, Safety reviews and inspections, Comprehensive Dam Monitoring, DAMDATA, Emergency Action Plan, Maintenance and Conservation, Risk Analysis

OFITECO'S participation in the 27th Congress and 90th Annual Meeting of the International Commission on Large Dams (ICOLD)

During the event, OFITECO presented a paper on the use of "Digital Technologies to Manage Dam Safety Records".

May 18, 2022, Lérida, Spain | Dams and reservoirs, Comprehensive Dam Monitoring, DAMDATA, Maintenance and Conservation

The Catalan Water Agency awards OFITECO, in a joint venture, the rehabilitation ‎works of the La Llosa del Cavall dam, in Lleida

The works, which will last 10 months, will consist of improving the dam safety by rehabilitating the drainage network and the monitoring system.

May 14, 2021, Granada, Spain | Dams and reservoirs, Comprehensive Dam Monitoring, Maintenance and Conservation

OFITECO begins works on the maintenance, conservation and operation of ten state-owned dams in the province of Granada

The General Water Authority and the Guadalquivir Hydrographic Confederation have entrusted OFITECO, in a joint venture, with the execution of the work, which will be carried out over a period of 36 months.

October 25, 2018, Melbourne, Australia | Dams and reservoirs, Safety reviews and inspections, Comprehensive Dam Monitoring, DAMDATA, Emergency Action Plan, Maintenance and Conservation, Risk Analysis

OFITECO takes part at ANCOLD Conference 2018

OFITECO presented its recent experiences in dam rehabilitation and the remote surveillance of dams using CCTV at the main event for dam professionals in Australia.

October 26, 2017, Hobart, Tasmania | Comprehensive Dam Monitoring, DAMDATA

OFITECO presents DamData at the Australian National Committee of Large Dams ANCOLD Conference

OFITECO presents their experience with its monitoring information management system DamData at the main event for dam professionals in Australia.

August 04, 2017, Zaragoza, Spain | Dams and reservoirs, Safety reviews and inspections, Comprehensive Dam Monitoring, DAMDATA, Maintenance and Conservation

OFITECO will prepare the annual safety and monitoring reviews of the dams belonging to the Ebro River Basin Authority

As a company specialised in inspection, safety reviews and monitoring reports of dams, OFITECO will carry out the safety assessment of 50 dams located in the 8 provinces covering the Ebro river basin.

July 03, 2017, Prague, Czech Republic | Dams and reservoirs, Safety reviews and inspections, Comprehensive Dam Monitoring, Maintenance and Conservation

OFITECO is actively present in the 85th annual meeting for the Large Dams International Commission, happening in the Czech Republic

Every year OFITECO answers the call made by the International Commission on Large Dams by attending the meeting and actively participating in the reunion held in Prague, between July 3rd and 7th.

April 06, 2016, Tlemcen, Algeria | Dams and reservoirs, Safety reviews and inspections, Comprehensive Dam Monitoring, DAMDATA, Emergency Action Plan, Maintenance and Conservation, Risk Analysis

OFITECO continues working in the rehabilitation study of the singular Meffrouch dam (Algeria)

OFITECO provides highly specialised consulting solutions to the Algeria’s Nacional Agency of Dams and water transfers in order to recover and ensure the safety level of the Meffrouch dam.

November 24, 2015, Cantabria, Spain | Dams and reservoirs, Safety reviews and inspections, Comprehensive Dam Monitoring, DAMDATA, Emergency Action Plan, Maintenance and Conservation, Risk Analysis

OFITECO will execute the works for Ebro’s dam Emergency plan in Cantabria (Spain)

Works include the actions designed to face eventual emergencies in Campoo-Los Valles (Cantabria) and Las Merindades (Burgos) regions.

November 24, 2015, La Rioja, Spain | Dams and reservoirs, Safety reviews and inspections, Comprehensive Dam Monitoring, DAMDATA, Emergency Action Plan, Maintenance and Conservation, Risk Analysis, Flood protection

OFITECO will implement the Emergency Plan of the Pajares and González-Lacasa dams (Spain)

OFITECO starts the works in order to implement Emergency Plans according to the requirements of the Ministry of Environment’s Technical Guide for the development of Emergency Plans in Dams, after entering yesterday into a contract with the Ebro’s River Basin Authority.